Roadway Drainage Issue
- German Township
- Feb 20
- 1 min read
German Township will be addressing the roadway drainage issue on Leon Lane. The project will involve enclosed drain tiles in most areas, replacing driveway culverts, backfilling with gravel, soil and seeding. We will be starting soon on the south end (Young Avenue) and working north as far as 2564 Leon Lane. Driveways with pavement over culverts will be repaved with asphalt per German Township Zoning guidance.